 |
The old barn as it was when Pieter Franken bought it. |
|
|
 |
The old barn is torn down (August 2005) |
|
|
 |
Drainage of the construction area |
|
|
 |
800 piles are installed to support the building |
|
|
 |
First concrete poured |
|
|
 |
Barn under construction |
|
|
 |
Installation of the cubicles |
|
|
 |
Overview of the barn |
|
|
 |
Building ready for the parlour |
|
|
 |
Installing the steel construction |
|
|
 |
Family takes a look |
|
|
 |
Steel deck is put in place |
|
|
 |
Upper ring is mounted. |
|
|
 |
Pieter Franken inspects the installation |
|
|
 |
Parlour is almost ready |
|
|
 |
Pieter Franken testing his new equipment |
|
|
 |
The Franken family in their finalized TURN-STYLE® HBR parlour (June 2006) |
|
|